Private sewage management at a conversion near Horsham
Background
Moody Sewage were invited to help assist in the identification of existing sewage treatment facilities and the feasibility of new sewage facilities for a farmhouse and a property conversion. The two properties were neighbours in the Horsham area.
As with all investigations Moody Sewage started with a feasibility study to allow a full understanding of the current methods of managing sewage, the available assets, the amount of pipework installed, its condition, and any locations of any existing sewage discharges into the surrounding watercourses.
Property 1 – The Farmhouse
The farmhouse comprised of a network of sewers that traversed around the garden. These appeared to be in a reasonable condition under both flow testing and a CCTV inspection. The sewers terminated into a sewage treatment plant at the end of the garden.
On inspection the sewage treatment facility comprised of a Rotating Biological Contactor manufactured by Klargester, the model being a Biodisc.
The Biodisc had not been regularly maintained and as a result had failed bearings, a failed motor, unsafe electrics, and required a new main drive shaft as well as peripheral drive cog and rollers on the motor itself.
Access Point
Sewage Treatment
A dye was also carried out on the existing Klargester Biodisc discharge to confirm the discharge point directly into the nearby steam. Although it is legal to do this, the quality of the effluent passing from a dilapidated system meant that it was in breach of Environmental Law.
The system itself, based on its physical size and amount of media within it could treat sewage for a population equivalent flow of up to 12 people.
Designs
The environmental checks confirmed that it would be possible to discharge into the nearby stream with treated effluent of a standard quality, based on 20 milligrams per litre Biochemical Oxygen Demand, and 30 milligrams per litre Suspended solids. There were no real environmental restrictions which would require a stricter discharge standard as this and therefore this quality was taken into considerations for all designs.
All options were considered including pumping from the bungalow into the existing Klargester Biodisc with a view that the maximum population in both properties could not exceed 10 to 12 people. Another alternative was to install completely new facilities making the Klargester Biodisc redundant, the facilities being large enough for a population equivalent flow of up to 18 people. The final solution involved overhauling the existing klargester biodisc and installing sewage facilities to treat a population equivalent flow of no more than 6 people in full time residency for the bungalow. Taking all into consideration it was decided that overhauling the Klargester Biodisc and installing separate facilities for the bungalow would not only be a more economical solution , but if proper were to change hands in the future, the systems would be independent from each other.
Environmental Permit
The Klargester Biodisc would not require an environmental permit as it should meet the vernal binding rules for small sewage discharges. This is also a historical discharge point that significantly pre dates 2015. The installation of the new sewage facilities for the bungalow required a full environmental permit which was duly obtained from the Environment Agency. Moody Sewage completed the necessary paperwork, submitted the permit and the application process took approximately 10 weeks.
The Farmhouse – Solutions
The Klargester Biodisc at the farmhouse was cleared of all debris and overgrown material, the electrical box removed and the system accessed. The system was de-sludged as the amount of heavy solids within the system were excessive and had clearly not been emptied for a very long time. The system was also jetted through so that the media was clean and could be re used once overhauled. A heavy duty lifting frame was erected up over the Klargester Biodisc, the motor removed, and the bearing unlocked.
The Rotor was lifted from the unit and dismantled into its key components removing both the shaft and the peripheral drive cog. A new shaft and peripheral drive cog were fitted to the media bales and where necessary new angle and U bolts were fitted where the old ones had become so heavy corroded. The new rotor was lowered back into the Klargester Biodisc together with new drive bearings and a new motor with a new pinion and nylon rollers installed. New electrics were installed onto the system and the system returned back to normal operation.
Property 2 – The Bungalow
The bungalow was inspected to confirm that some sewers had been installed from the main building through to inspection chambers located out and into the garden where the pipe simply terminated. The pipework was constructed from 110mm UPVC and there were no further facilities located anywhere in the garden. The bungalow had no management system in place at all.
The Bungalow, at the start of the installation of the new sewage facilities, was under construction. Moody Sewage worked alongside the construction team on site to be able to supply and install a bespoke activated sludge plant, which was selected by the client, to manage the sewage from the property. The system itself comprises of 2 modules, a balancing tank and a reactor tank.
The management system treats sewage on a batch processing method called SBR, this unit being known as a SABRE V2800. This method of biologically processing sewage provides not only a robust method of biological digestion which can respond somewhat quicker than standard contact biological digestion or extend filtration, the system cannot be overloaded or suffer from serge flows due to the way in which the sewage is treated in batches. One of the significant advantages of this type of sewage treatment facility is that there is very minimal aesthetic impact within any garden or sensitive location of installation.
The sewers from the bungalow were also extended through to the sewage treatment plant and then discharge from the sewage treatment plant passed across the rear field and into the same pipe passing down and into the stream. Each system has its own independent sample point for monitoring. Power for the system was taken back to the bungalow and connected onto a supplied fuse spur from the contraction works.
Service and Maintenance
Both systems are being serviced and maintained regularly to ensure that small insignificant problems do not escalate into larger more expensive ones. They are also both de-sludged at least once a year to remove the build up of heavy solids from the bottom of the primary settlement tanks. All of the works has now been completed and both systems produce a high quality effluent in line with environmental law.
Posted on Google
Alex
26 June 2026
On time, efficient and polite.
Recommended.
Posted on Google
Fiona
12 June 2026
Just used Ross at Moody’s for the first time - what a positive experience - he was so helpful, polite and friendly. What a difference - would recommend to anyone and would definitely use again! Thank you so so much
Posted on Google
Sarah Hickling
27 November 2025
Efficient and friendly service, thank you. Highly recommend :)
Posted on Google
Karen Hathaway
19 November 2025
Very pleased with the service and expertise provided by Moody. Highly recommend!
Posted on Google
Robbo Baker
19 October 2025
Easy enough to find to deliver to ,was tipped in 10 mins and back on my way
Posted on Google
Alan Sayers
12 October 2025
Excellent service from booking to work being completed. The driver and his colleague were so professional and friendly. Would fully recommend Moody.Thank you
Posted on Google
chris hughes
15 September 2025
5 stars to Lee for his professionalism and his attitude - even when faced with neighbours who had clearly not go the memo!
Posted on Google
R B
14 September 2025
Brilliant company!
Friendly office staff, and a very competent driver who was pleasant and cheerful. He skilfully negotiated my tricky drive, which has a sharp turn off a fast main road, then was careful on site to avoid damaging all my plants with the pipework.
An excellent service from start to finish.
Posted on Google
CHRIS HUGHES
12 September 2025
I just want to pay tribute to one of Moodys drivers. Lee.
We have difficult access to our system down a very narrow lane. Lee completed the whole programme with total profess